Quantcast
Channel: HomeSeer Message Board
Viewing all articles
Browse latest Browse all 4847

How can I have a event only trigger once a day ?

$
0
0
I have a event which turn off a virtual switch when a virtual RFXcom power device, which is a daily accumulated power, goes over 10.
Looking at the logs, it looks as if every time that accumulated power increases, it turns that switch off again. That would be fine - but, I want to be able to manually turn that switch back on again, and then it should stay on until tomorrow.
So basically once the power produced goes over 10, turn off that virtual switch. If I tuen the virtual switch on after the event has turned it off, do not turn it on again for that day. The power produced device resets to 0 at midnight.
This virtual switch is meant as a override, so if its been turned off via the event, I want to be able to override it. This is all reset at midnight.

Viewing all articles
Browse latest Browse all 4847

Trending Articles